Hello All,
Here's my SOURCE configuration:
1) Dell PowerVault NX3100 running Windows Storage Server 2008 R2 Standard
2) Attached to the NX3100 is a Dell PowerVault MD1200 (NAS)
3) SSR 2011 SP3 installed on the Dell NX3100 Win Storage Server 2008 R2 Standard
Here is my DESTINATION/TARGET configuration:
1) Being Backuped to a different Dell PowerVault MD1200 (NAS) that is attached to another Dell PowerVault NX3100 (Same OS as above)
History:
Initial backups to the other Dell MD1200 (NAS) was working fine. Backup Job setup to run Weekly - Mon - Full Backup, Tue thru Sat - Incremental backups
Data being backuped resides on my SOURCE configuration's MD1200.
Backup Destination/Target is to a different Dell MD1200.
Now we are experiencing backup failures.
Here is the Event Log Entry:
Error EC8F17B7: Cannot create a recovery points for job: Drive Backup of JISTL (F:\).
Error EC8F03EA: Cannot create a virtual volume image of the selected drive.
Error EBAB0013: A test that safeguards the integrity of the program failed unexpectedly. Bad numeric conversion: positive overflow (UMI:V-281-3215-6071)
Has anyone encountered this error before? Thank you in Advance for any support.
V/R,
Jessie