ソリューションが必要です
Hi all,
I have a job with some uninstall tasks with a reboot but when the computer come back up it doesnt continue where the job left off right away. It has to check back in with NS/Task server to finish the last job of installing software. Is there a way to make the job contiue right away?
NS 7.1
Server 2008 R2
Thanks
Jen